Factory Productivity and Scheduling
Set Up Forward / Backward Scheduling
To Set Up Forward and Backward Scheduling, from the Main Menu, select Tools > Settings then select the Scheduling tab (see highlighted below)
Clicking the Advanced button (see highlighted above) displays a number of advanced settings.
Ensure that Allow Forward and Backward Schedules is set to on (as displayed below)
Only an Administrator can change this setting.