Factory Productivity and Scheduling2 min read
Making a Complete Project
To make a Complete Project
- From the Main Menu select Task > Complete Project.
- Enter a name for the Project.
- From the drop down Job Number box select a Job Number.
- From the drop down Product box, select the Product you want to be part of the Project and click Add.
- This will add the Job Number and the Product to the Project. Once the second Job and Product is added your page should look similar to
- You can add as many lines as you wish. Click Save to create the Project.
- Each Project can be assigned in the same way that a (non Project) Task is assigned.
See Assigning Tasks.
Or alternatively the Projects can be Auto Assigned - see Auto Assigning Complete Projects