Easy Scheduling
As well as Automatic Scheduling its possible to use Empower's Easy Scheduling.
Easy Scheduling overrides Automatic Scheduling by allowing a Schedule to be chosen when the Job is created or edited.
Perhaps the best way to explain this is through an example.
- Easy Scheduling is turned off by default - so firstly turn it on.
To do this
- from the Main Management Menu select Tools > Settings.
- Then on the left hand side of the page select the Scheduling Tab - highlighted below.
- And ensure that Allow Easy Schedule is switched on (see highlighted below).
- Ensure you have a Forward Schedule or Backward Schedule set up.
For this example we will use a Forward Schedule named Easy Forward Sched 4 Day
This Schedule will schedule
- The Step 1 Process 1 day after the Job Received Date
- The Step 2 Process 2 days after the Job Received Date
- etc. - see highlighted below
- Finally from the Main Management Menu select Job > New
You should see a page similar to below - note the new field available to select the Schedule (see highlighted below).
Enter the job in the normal manner - in this example we will use a Product called Product 1, that has four Processes - Process1, 2, 3 and 4.
Once the Product has been selected, clicking on the drop down box to the right of the Schedule the Schedule column you will see the various Schedules available - see highlighted below.
In this instance we will select the Schedule Easy Sched Forw 4 Day as per point 2 above.
This will schedule the first Task 1 day after the Job Received Date, the second Task 2 days after etc, etc. See highlighted below.
Some points to note:
- Both Forward and Backwards Schedules can be selected.
- It is even possible to have 2 Products in the same Job and have one set as a Forward Schedule and one as a Backward Schedule
- Easy Scheduling overrides Automatic Scheduling. This means that altering the default Scheduling to Forwards or Backwards (or vice versa) in Tools > Settings has no affect on Tasks scheduled using Easy Schedule.
- Selected Easy Schedules can be edited in the Job > Edit page
- If an an error message saying "No Processes Match" is displayed (see highlighted below) this means that none of the Processes in the Product match the Processes in the Schedule - ie in our example above the is no Task 1 , 2, 3 or 4 and so no Processes will be scheduled.
- It is possible when Importing Job Data to map a field to the Easy Schedule name.